Checklist for installing deep tubewells in Bangladesh

Checklist for installing deep tubewells in Bangladesh

11 March 2016

This document offers a step-by-step check list for installing deep tubewells in Haor and coastal areas of Bangladesh. It is based on our experience with Charity:  Water as well as current guidelines.

The check list covers eleven steps, from preparation right through to the water quality testing and maintenance steps of the post-installation phase. 

Download the publication using the link below.

Download a copy of this resource

Checklist for installing deep tubewells in Bangladesh

This document provides a step-by-step check list for installing deep tubewells in Haor and coastal areas of Bangladesh.
  • Wash protocol for deep tubewell installation in haor coastal areas